Services / Data Acquisition Systems

Data Acquisition Systems

Reliable plant data, collected without touching your control logic.

We connect to the PLCs, SCADA systems, sensors and instruments you already run, and deliver clean, time-stamped data to a historian or dashboard. No control re-architecture, no lost data when the network drops.

Sound familiar?

Problems we solve

  • Production data trapped in PLCs and local HMIs
  • Operators still logging readings on clipboards and spreadsheets
  • A historian full of gaps, bad timestamps and tags nobody can decode
  • Every machine and vendor speaking a different protocol
  • Data lost whenever the network or server goes down
Data acquisition: PLCs, SCADA and sensors to an edge gateway, historian and dashboardsSENSOR → EDGE → HISTORIANPLCsRockwell · SiemensSCADA / HMIAlarms · eventsSensorsInstruments · I/OEdge gatewayStore-and-forwardHistorianClean time-seriesDashboardsOEE · qualityEtherNet/IPModbus TCPOPC UAMQTT Sparkplug B

Tools and protocols

OPC UAMQTT Sparkplug BModbus TCPEtherNet/IPSiemens S7SQLPythonDocker

Related expertise

What we deliver

What you get

Edge gateways

IPC or Raspberry Pi class gateways connected to Rockwell, Siemens and Modbus devices, deployed in containers so they are easy to update and recover.

Store-and-forward

Local buffering so a network outage delays data instead of losing it.

A tag and data standard

Consistent naming, units and context so data means the same thing on every line.

Historian setup and cleanup

New historians, or repair of existing ones: gaps, time sync, compression and retention.

Data-quality checks

Flatline, range and staleness checks that warn you before bad data reaches a report.

Fixed-fee starting points

Start with a package

01

Smart Start: Plant Data Readiness Audit

$3,000
5 business days

Plants beginning digital transformation or looking to unify data across systems.

  • 2-day remote or onsite review of PLC, SCADA, historian and network systems
  • Identification of data silos, gaps and optimization opportunities
  • Written readiness scorecard with recommended next steps
  • 30-minute strategy call with site leadership

Readiness scorecard and a prioritized next-steps roadmap

Start with this
04

Edge Start: Gateway Kit and Deployment

$12,500includes hardware
2 to 4 weeks

Plants that want actionable data without re-architecting their controls.

  • Pre-configured industrial edge gateway (IPC or Raspberry Pi class)
  • Connection to existing PLCs: Rockwell, Siemens, Modbus and more
  • Data collection to a local historian or cloud dashboard
  • Remote deployment plus a basic dashboard build

A deployed edge gateway streaming live plant data

Start with this

See all packages

Start with one problem that costs you every week.

Tell us what's slow, manual or stuck. We'll come back with a plain answer: a fixed-fee package, a scoped build, or advice on whether to do it at all.